Colloide were contracted as management contractors responsible for all project management & design which included Civil, mechanical & electrical works.
Project outline:
A new sludge recycling facility was installed which took waste sludge from a quarry and treated it, dried it and pelletized it into a agricultural fertilizing product.
Project description:
The plant consisted of the following treatment streams and buildings:
Sludge pressing plant
Dried sludge storage building
Rotary drier with feed system
Raw material silos
Chemical storage & dosing system
Pelletizer system
Fluid bed dryer
Grading screen
Conveyors
Product silos
Bagging system
Lorry discharge system
Dust extraction units (3 systems)
Silo building
Main treatment building
Further information
This was the first plant of its type in Ireland/UK. Colloide worked closely with an American company to provide the pelletizer and driers but all other equipment was designed and built locally. The plant has been a major success for Acheson & Glover.