Colloide Checmical Dosing Rigs on Severn Trent’s AMP6 Framework
To date Colloide have supplied over 30 Chemical Dosing Rigs to Severn Trent Water under the AMP6 Framework Agreement. Earlier this year Tier 1 contractors on the Framework visited Colloide’s Head Office to view the first phosphorous removal Chemical Dosing Rig. Tier 1 contractors included Costain, Mott MacDonald Bentley and North Midland Construction.
Colloide’s Chemical Dosing Rig was described by Severn Trent as “The Ultimate Standard Product”. (Read full article here). Creating this suite of standard designs delivered significant time and cost savings for the CiM6 team by moving away from individual reviews of designs for each site.
Clun STW Chemical Dosing Systems
Colloide’s supply of Chemical Dosing Rigs for MMB make way to Clun STW and Newcastle on Clun STW.
Turnaround time, from date of order to site installation, was cut drastically for Severn Trent Water. Thus, allowing the Framework to accelerate the rate at which Water Framework Directives met in their respective catchment areas; hence improving the overall water quality.
Most recently Colloide have secured orders from North Midland construction for Kinoulton STW and Nether Broughton STW.
Our interactive chemical dosing installation map
This map highlights Colloide’s presence all over the UK on the delivery of this Framework Agreement.
Find out more
Check out our full range of water treatment technologies or if you would like to speak with us about this particular product or Chemical Dosing Systems.
Get in touch>
Similar Projects


