Colloide Supply Lamella Settler System for GE Power and Water (SUEZ)

World leading energy provider GE Power and Water (SUEZ) have awarded Colloide the contract to supply Lamella Settler System for Heigham Water Treatment Works in Norwich. The scope of works will include a 3-stream system, an integrated platform with access to stairs, flocculation tank and splitter tank.

The expected delivery date for this project is April 2018. Colloide look forward to working with GE Power and Water (SUEZ) on this project over the coming months.

Colloide’s Lamella Settler tanks can be designed in a wide range of sizes and configurations to suit the individual needs of each of our clients. Full details on our Lamella Systems can be viewed here.

Colloide Supply Lamella Settler System for GE Power and Water (SUEZ)