Colloide have been successful in bidding for the contract to supply chemical dosing packaged units. Southern Water’s £10 million AMP7 contract which went out to tender in May 2019, covers the provision of plant, materials and services for the design, supply, installation and commissioning of packaged chemical dosing units for approximately 78 sites in the…
Read MoreWater Consumers celebrating lift of 22 month boil water notice Colloide are delighted to note that due to the upgrade works at Lough Talt Water Treatment Plant (WTP); a site where we recently designed, supplied and delivered Package Sand Filter Systems. Irish Water have lifted the boil water notice issued on the supply on 11…
Read MoreHeat from the River Tyne used to warm homes and schools, cutting carbon and saving money After a competitive tender process, South Tyneside Council Cabinet has appointed Colloide engineering Systems the contract to construct the groundbreaking Viking Energy Network at Jarrow. This district heating system is the first of its kind in the country and…
Read MoreColloide were delighted to take part in two brilliant events focusing on district energy systems; Elemental UK District Energy Series and the Danfoss DEN Digital Festival.
Read MoreThis year we have selected Women’s Aid, Causeway and Mid-Ulster and Gold SureStart as our chosen charities. Our main aim this year was to give back to our local community!
Read MoreThe Department for International Trade (DIT) is holding a virtual trade show, UK ChemOnline, which is supported by CHEMUK and is free to attend. It will run on 19th & 20th November 2020.
Read MoreColloide were appointed as Mechanical and Electrical sub-contractor to complete the Design, Manufacture, Delivery, Installation, Offloading, Commissioning and Testing of Ferric Dosing for JN Bentley on behalf of Welsh Water. These works are part of the ongoing framework contract Colloide have in place for package dosing systems with Welsh Water.
Read More4No. rotating half bridge scrapers supplied for two 16.5M primary settlement tanks (PSTs) at Haddington Wastewater Treatment Works by Colloide Engineering Systems. Colloide contracted for the detailed Mechanical & Electrical design, supply and delivery of the bridge scrapers. ESD acted as the main contractors and carried out the civil engineering works.
Read More