Colloide were appointed as Mechanical and Electrical sub-contractor to complete the Design, Manufacture, Delivery, Installation, Offloading, Commissioning and Testing of Ferric Dosing for JN Bentley on behalf of Welsh Water. These works are part of the ongoing framework contract Colloide have in place for package dosing systems with Welsh Water.
Read More4No. rotating half bridge scrapers supplied for two 16.5M primary settlement tanks (PSTs) at Haddington Wastewater Treatment Works by Colloide Engineering Systems. Colloide contracted for the detailed Mechanical & Electrical design, supply and delivery of the bridge scrapers. ESD acted as the main contractors and carried out the civil engineering works.
Read MoreEarlston Wastewater Treatment Works (WwTW) General Project Overview Colloide were awarded the design, supply and delivery of 3no. rotating half bridge scrapers for one 11.8m Primary Settlement Tank (PST) and 2 Humus Settlement Tanks (HST) at Earlston Wastewater Treatment Works (WwTW) in collaboration with ESD or Scottish Water.
Read MoreChalton works in Bedfordshire is now the largest sand filtration unit in Europe, designed in response to a significant change in the standards required for discharge. Anglian Water awarded Colloide the contract with the purpose to reduce ammonia and solid levels from the previous treatment plant. Anglian Water Services was advised that consent had…
Read More