Colloide have been successful in bidding for the contract to supply chemical dosing packaged units. Southern Water’s £10 million AMP7 contract which went out to tender in May 2019, covers the provision of plant, materials and services for the design, supply, installation and commissioning of packaged chemical dosing units for approximately 78 sites in the…
Read MoreWater Consumers celebrating lift of 22 month boil water notice Colloide are delighted to note that due to the upgrade works at Lough Talt Water Treatment Plant (WTP); a site where we recently designed, supplied and delivered Package Sand Filter Systems. Irish Water have lifted the boil water notice issued on the supply on 11…
Read MoreThe Department for International Trade (DIT) is holding a virtual trade show, UK ChemOnline, which is supported by CHEMUK and is free to attend. It will run on 19th & 20th November 2020.
Read MoreColloide Engineering Systems recently acted as Mechanical and Electrical sub-contractor, working under principle contractor, North Midland Construction PLC (NMCN) for Severn Trent Water as part of overall upgrade works at Mattersey Thorpe Sewage Treatment Works.
Read MoreColloide were appointed as Mechanical and Electrical sub-contractor to complete the Design, Manufacture, Delivery, Installation, Offloading, Commissioning and Testing of Ferric Dosing for JN Bentley on behalf of Welsh Water. These works are part of the ongoing framework contract Colloide have in place for package dosing systems with Welsh Water.
Read MoreWe are delighted to have been appointed as design and build contractors for the upgrade of Arlington Water Treatment Works (WTW). Colloide working on behalf of Enisca Browne in wider collaboration with South East Water are designing and upgrading the existing 5no. sand filters at Arlington WTW in East Sussex.
Read More4No. rotating half bridge scrapers supplied for two 16.5M primary settlement tanks (PSTs) at Haddington Wastewater Treatment Works by Colloide Engineering Systems. Colloide contracted for the detailed Mechanical & Electrical design, supply and delivery of the bridge scrapers. ESD acted as the main contractors and carried out the civil engineering works.
Read MoreWorld leading energy provider GE Power and Water (SUEZ) awarded Colloide the contract to supply a Lamella Settler System for Heigham Water Treatment Works in Norwich. This project was completed in May 2018 on time and to the original agreed value.
Read More